Muli, Gangakhed, Parbhani, Maharashtra 431514 +91 90113 51666   hifiipaints@gmail.com
Esy Bond exterior emulsion
Step 1: Prepare the surface

Clean and dry the surface. Sand with sand paper no. 180 to remove loose particles or dirt, then wipe clean. Fill the cracks.

Step 2: Apply putty

Apply 2-3 coats of Hi-Fii putty. Allow drying for 4-6 hours between coats, sand smooth and wipe clean.

Step 3: Prime

Dilute 1 litre Esy Coat with 1 litre of water and apply 1 coat. Allow to dry.

Step 4: Apply topcoats

Dilute 1 litre of paint with 500-700 ml of water. Apply 2-3 topcoats at intervals of 4-6 hours, using a felt roller for best results.

How much paint do I need?

Based on 140-160 sq.ft per litre per coat. Rough walls use more.

Tips for a better finish

Paint in dry weather

Avoid painting damp or wet walls. Use Esy Damp where moisture is a problem.

Dilute correctly

Too much water weakens coverage. Measure it.

Wait between coats

Allow 4-6 hours between coats.

Stir well

Stir the paint thoroughly before and during use.

Need help with your wall?

Our team can advise on surface preparation and the right system.

Contact us